Thursday, 25 November 2010

Shooting schedule

09/02/2011
plan to pick up camera from media technicians at approximately 12.00pm, we will then head to the studio and begin shooting at 1.00pm once the cast and studio have been prepared and costumes have been assembled. After the cameras and lighting have been positioned correctly we will begin shooting.

- between shoots we plan to capture back and view all the footage from the first shoot. This will allow us to more easily keep continuity despite large gaps between filming.


09/03/2011
plan to shoot at 1.00pm and shoot till 5.00pm. The plan will be the same as before, we will pick up the cameras and allow approximately an hour for preparation and setting up the studio.


Equipment list:
-3 x Xm2 cameras
-2 x portable lighting rigs
-3 x camera tripods
-1 x greenscreen

Costumes:
-various hoodies & jumpers
-6 x flatcaps
- various jewelry